Client Details:

Client: Liddell Power Station

Location: Liddell Power Station, Hunter Valley, NSW

Running Pressure: 12 bar

Bottom Ash pipeline

Up to 65% w/w solids. 3.8 SG solids. 20mm max solids

Summary

Bare pipe was used in lieu of basalt lined steel due to flexibility, life required, and compatibility with other project
goals.

Client Details:

Tronox Dredge Bearings

Summary

Bearings made from superior PBA plastics used as bushing/bearings.
Improving on the life of Vesconite 4:1.