Client: Liddell Power Station
Location: Liddell Power Station, Hunter Valley, NSW
Running Pressure: 12 bar
Bottom Ash pipeline
Up to 65% w/w solids. 3.8 SG solids. 20mm max solids
Bare pipe was used in lieu of basalt lined steel due to flexibility, life required, and compatibility with other project
goals.
Tronox Dredge Bearings
Bearings made from superior PBA plastics used as bushing/bearings.
Improving on the life of Vesconite 4:1.